| These photo's the various stages of work that was done. Thanks to: Paddy, Shane, Richard and Gary for the welding; Geoff for the wiring; Nick for the spraying; Dad ,Chris and Tony for general advice, help and manpower; Chris the postie for the original Triumph workshop manua; Steve Knight for the help rebuilding the engine. | |
![]() Engine bay |
![]() Bits gradually coming off it |
![]() New gutter rail added, NOTE the hole in the front footwell |
![]() New gutter rail added |
![]() Offside rear inner wheel arch removed and rust treated |
![]() Nearside rear inner wheel arch removed and rust treated |
![]() New offside rear inner wheel arch pop rivetted and panel glued on |
![]() New inner wheel arch painted up |
![]() Front sill repaired by Paddy |
![]() Front sill repaired |
![]() Front foot well |
![]() |
![]() Shane welding |
|
![]() Boot floor prior to being removed |
![]() Old boot floor removed |
![]() Nearside front footwell repair panel |
![]() Nearside front footwell - hole where bolt to front outrigger should be |
![]() Nearside floor pan - rot removed where holes for the seat bolts used to be |
![]() Offside floor pan - rot removed where holes for the seat bolts used to be |
![]() Floor pan painted up underneath |
![]() Floor pan painted up inside |
![]() Centre of tub and boot painted up |
![]() Centre of tub and boot painted up |
| Next | |
| 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 | |